第A07版:Nantong report

The 1000th ring

At 21 October dawn, by the Yangtze River in Haimen, good news came from China Russia east natural gas pipeline project Yangtze River TBM tunnel construction site that ‘Changtong’ tunnel boring machine crossed 1000 ring mark, the length of formed tunnel is 1500m, and 15% of the project task has been completed. Photo by Peng Junjun

2021-10-29 1 1 南通日报 content_78731.html 1 3 The 1000th ring /enpproperty-->